Figured out recently that adding the bathroom was going to be a much bigger level of effort than anticipated and open up a can of worms with the existing work done down below.  

So, new plan is to vault ceiling in the kitchen, extend back kitchen wall, and art hallway storage instead.  Still add a second door to the bathroom from the new master. 

  

Advertisements