Had to wait 2 full days for the city to come out and inspect the screws. Kinda annoying, but finally done. 
Basically, they are looking at spacing (on studs, every 8-10″), depth (did not break the paper, that the right type was installed (1/2 inch walls and 5/8 ceiling)  
 

Advertisements